IGBC Platinum certified. Still 89% grid-powered.
How a global automotive technology company turned a green building into a measurable decarbonisation plan.
Get the full case study
Fill in the 30-second form to get the full case study.
Your case study is ready
Download it below. We have also emailed you the link; it works for 7 days.
Download the case studyPDF, 1.1 MB, 18 pagesThe full case study is almost ready. We will email it to you as soon as it is out.
We could not reach our server just now. Your details are saved on this device and will be sent automatically when you are back online; the download link then comes by email.
Curious what we'd find at your site? Ask for a free ESG gap assessment.
- campus
- 1.2M sq ft
- people
- ~3,500
- of electricity from the grid
- 89%
- potential Scope 1 + 2 cut by 2029
- Up to 22.5%
* Potential, from illustrative scenarios, subject to baseline validation.
What's inside
- 01The complete FY 2024–25 baseline (Scope 1, 2 and 3)
- 02The scenario models to 2029 (business as usual, growth and reduction)
- 03The full decarbonisation roadmap: renewables, diesel, water and waste
- Format
- PDF, 1.1 MB
- Length
- 18 pages
- Price
- Free